2020-02-29 21:11 BrowseTimes
Application
Satisfy kinds of working and the need of well completion, widely apply for sealing plug between the
layers, high pressure acidification , zonal acidification, mining and drainage & gas extraction, repair
well, casing cement injection, gravel pack, etc ,process measures
and well completion production. Used for oil and gas layer protection, preventing pollution, and sand
control, etc.
• Adopt high strength clip , which can bear higher two-way differential pressure.
• Large ID, satisfy the normal testing requirements.
• The special metal ring can prevent the flowing on the condition rubber tube pressure is very high.
•
Hydraulic sitting, can be used for high angle wells.
• Without moving packer, can free up the tubing string.
• Hydraulic setting, can't be released
Specification |
5’’ |
5-1/2’’ |
7’’ |
7’’ |
|
packer |
OD. (in) |
4.01 |
4.40 |
5.74 |
5.87 |
ID. (in) |
2.28 |
2.28 |
3.62 |
4.00 |
|
Length (in) |
35.23 |
35.23 |
43.30 |
32.67 |
|
Seal Extension Sub |
OD. (in) |
3.54 |
3.54 |
5.19 |
19 |
ID. (in) |
2.28 |
2.28 |
3.62 |
4.00 |
|
Length (in) |
According to the application |
||||
Hydraulic Setting Tool |
OD. (in) |
3.93 |
4.40 |
5.74 |
5.86 |
ID. (in) |
1.02 |
1.02 |
1.41 |
1.41 |
|
Length (in) |
38.18 |
38.18 |
40.15 |
47.24 |
|
Temp. (℉) |
250-300 |
||||
Pressure (psi) |
10000 |
||||
Thread (in) |
2-7/8 EU |
3-1/2 EU |